News
Most factory pages tell you the factory is strong. This one works the other way round: every photograph below is the production floor, and the text names what is actually in the picture. If a claim cannot be seen in a photograph or counted in a workshop, it is not here.

The plant entrance in Dongguan, Guangdong. Forming, sewing, aluminium-frame assembly and packing all sit behind this gate. The shell does not travel to a second factory.
Hard shells are formed in house, not bought in. Twelve vacuum-forming machines press ABS, ABS+PC and PC sheet into shell halves, and two sheet-extrusion lines produce the sheet itself, so a change of material or thickness does not wait on an outside supplier. Five injection moulding machines cover the PP side of the range, where the shell is moulded rather than vacuum formed.

An injection moulding machine running PP shells. Five machines cover the PP range; the vacuum-forming hall handles ABS, ABS+PC and PC.
Every case needs two shell halves, and that is the number that matters when you are checking whether a delivery date is realistic. Twelve vacuum-forming machines at eight hundred sheets a day give 9,600 sheets, or 4,800 cases. Five injection machines run around the clock, fully automatic, at 1,600 sheets a machine per day: that is 8,000 sheets, or 4,000 cases.
Sixty sewing machines run the soft side of the business and every lining in the hard range. This is the part of a luggage factory that is hardest to scale quickly, because it is people rather than machines: a lining is only as good as the person setting it, and the same team that sews soft luggage also sets the interior of the aluminium-frame cases.

The sewing floor. Sixty machines, set in rows, running soft luggage and hard-shell linings on the same floor.
Aluminium-frame cases are assembled on their own line, at stations labelled on the floor for lining fitting and hardware assembly. A frame case is not a zipper case with a different closure: the frame has to be bent, the lining set against it, and the hardware fitted to a tolerance a zipper case never sees. Keeping it on a separate line is why the same factory can run both without one slowing the other down.

The aluminium-frame assembly area. The station signs on the line read lining fitting and hardware assembly, the two steps that decide whether a frame case closes true.
Cases move from forming and lining into final assembly, then to inspection and packing. This is where a programme either arrives intact or arrives with claims, and it is the stage most factory pages leave out because there is nothing photogenic about it.
Design capacity across the two forming processes is 8,800 pieces of luggage per day: 4,800 from vacuum forming and 4,000 from injection. That is machine capacity, not a promise about any particular month. Real output depends on the material mix, the shell size and how much of the month goes into changeovers, so we quote delivery dates against the actual schedule rather than against this figure.
If your programme needs a shell shape we already form, the constraint is scheduling. If it needs a new shape, the constraint is tooling, and that is a different conversation. Either way, the answer starts with which machine your shell will run on, and that is a question we can answer before a sample is made.
No.102 Jinsha road, Shijie town, Dongguan city, Guangdong province, China
+86 188 2582 1428+86 15362078058
Copyright © Smarter Luggage Bag Co., Ltd. All Rights Reserved | Sitemap | 粤ICP备2026141603号-1